430 Head Boar Stud
Denovo designed and installed an air conditioning system for a 430 Head Boar Stud. The new system provides our client with two big advantages. Heat stress will be reduced, giving the animals the best environment to maximize production, and the air flow will be filtered, eliminating the need for a filter wall.
Details
Project
430 Head Boar Stud
Client
Gilbert Community School District
Location
Gilbert, IAProject Size
135,000 sf of new construction
49,000 sf demolished existing construction
16,000 sf of renovations
Architect / Engineer
Architect Name
Market
Education
There’s Something Special Happening!
We want to work with you. Get in touch to discuss your challenges. We’re here to help in any way.